MlcunChange Order Template

Change Order Template

This change order template is for contractors, owners, and architects who need a simple record of contract changes. It includes a change order number, project, date, owner, contractor, architect or engineer, and contract date. The form has a table for description of change, amount plus or minus, and days plus or minus. It also includes fields for original contract sum, net previous change orders, sum before this change, this change order, new contract sum, and new completion date, plus signature and date lines for owner, contractor, and architect.

Preview of Change Order Template

Free printable · PDF

  • 1 page
  • US Letter — choose “Fit to page” for A4
  • PDF, 57 KB
Download free PDF

Free for personal, family and classroom use.

Need to edit it? The full pack has the editable Word and Excel files plus all 4 sheets — $5.00, one-time.

Use it to document each approved change before work moves forward, then complete the totals and signatures for the project file. Print it for paper approval or fill it in digitally and save the signed copy with the contract records.

Good for

Tip: Print on letter paper and keep a signed copy with the contract file.

4 files · DOCX, PDF, XLSX

Get every sheet: Change Order Template Pack

This sheet plus 3 more in one download, with the editable Word and Excel files. Editable Word change order, an Excel change order log with running contract totals, a change order request form and a time-and-materials worksheet.

$5.00 USD, one-time 4 files · about $1.25 each

7-day money-back guarantee. Full refund within 7 days of purchase, even after you download.

More free printables

Preview of Printable Change Order LogPrintable Change Order Log2 pages · free PDFPreview of Change Order Request FormChange Order Request FormFree one-page change order request form with project details, cost columns, overhead and profit, days requested, and validity fields.1 page · free PDFPreview of Printable T&M WorksheetPrintable T&M WorksheetTwo-page time and materials worksheet with labor hours, rates, material costs, and auto-calculated totals. Includes Date, Worker or item, Hours or qty, Rate, and Amount.2 pages · free PDF